Real railway developments
+2
mikehendle
rufuskins
6 posters
Page 1 of 1
Real railway developments
It's interesting to see development in the real railway world.
1. Work is well underway for the reinstatement of the "waverley" route.
2. Kings Cross station refurbishment is due to be unveiled soon.
3. Serious consideration is being given to reinstatement of a rail ink in Sussex between Uckfield and Lewes.
4. London Bridge station remodelling - part of the Thameslink project - is also well underway, and is expected to take up to 5 years.
5. Crossrail 2 is still being heavily promoted - of course Crossrail itself is also underway.
6. HS2 - the less said the better!
Alec
1. Work is well underway for the reinstatement of the "waverley" route.
2. Kings Cross station refurbishment is due to be unveiled soon.
3. Serious consideration is being given to reinstatement of a rail ink in Sussex between Uckfield and Lewes.
4. London Bridge station remodelling - part of the Thameslink project - is also well underway, and is expected to take up to 5 years.
5. Crossrail 2 is still being heavily promoted - of course Crossrail itself is also underway.
6. HS2 - the less said the better!
Alec
ALEC - Supporter of MSTS and TSSH!
rufuskins- Posts : 3731
Join date : 2013-01-17
Age : 76
Location : Milnrow, Lancashire
Re: Real railway developments
Hi
At Peterborough there is major work going on,a complete new platform and re alignment of the through tracks,remodelling of Nene Valley Siding,at Hatfield a new flyover for the Cambridge Bound Trains,this will stop up ECMLtrains from having to slow down
Mike
At Peterborough there is major work going on,a complete new platform and re alignment of the through tracks,remodelling of Nene Valley Siding,at Hatfield a new flyover for the Cambridge Bound Trains,this will stop up ECMLtrains from having to slow down
Mike
Mikeex Zuid Afrikaans Sporweg employee[i]
mikehendle- Posts : 625
Join date : 2013-01-17
Age : 76
Location : Peterborough UK
Re: Real railway developments
Just to add that we have the Reading re-modelling ongoing at present which is partially linked to Crossrail; but has other advantages as well.
On a smaller scale; a number of stations are being improved on the Waterloo/Reading lines with existing footbridges replaced by "accessible" bridges.
On a smaller scale; a number of stations are being improved on the Waterloo/Reading lines with existing footbridges replaced by "accessible" bridges.
Truth is rarely pure, and never simple.
Re: Real railway developments
gswindale wrote: . . replaced by "accessible" bridges.
Mmmm . . .
Alec
ALEC - Supporter of MSTS and TSSH!
rufuskins- Posts : 3731
Join date : 2013-01-17
Age : 76
Location : Milnrow, Lancashire
Re: Real railway developments
Alec,
"Accessible bridges" refers to overhead foot bridges with lifts for wheel chair/elderly folks access.
Nearly every station in Sydney is being/has been upgraded to be more "accessible" for everyone.
Portable (foldable) wheel chair ramps; "tactile tiles" (lumps on the ground for the vision impaired) along platform edges, top and bottom of steps, etc; improved lighting; new lifts and improved station entrances are what most of the refits involve.
So whilst they make the stations easier to access, you need to just ignor the fact that they now want to introduce 30 sec "train stationary" times at the non "city stations".
Whilst I may be able to move quick, there are a loto of people who complain that the current 1 min stops aren't long enough.
Justin
"Accessible bridges" refers to overhead foot bridges with lifts for wheel chair/elderly folks access.
Nearly every station in Sydney is being/has been upgraded to be more "accessible" for everyone.
Portable (foldable) wheel chair ramps; "tactile tiles" (lumps on the ground for the vision impaired) along platform edges, top and bottom of steps, etc; improved lighting; new lifts and improved station entrances are what most of the refits involve.
So whilst they make the stations easier to access, you need to just ignor the fact that they now want to introduce 30 sec "train stationary" times at the non "city stations".
Whilst I may be able to move quick, there are a loto of people who complain that the current 1 min stops aren't long enough.
Justin
Re: Real railway developments
If its of any interest and anybody is in West Yorkshire there is a mon to Friday working into kellingley colliery and its supposed to have a 56 hauling it times will be on real train times due through knottingley around 5.20
Steve
Steve
steveenefer- Posts : 20
Join date : 2013-02-13
Age : 47
Location : Pontefract
Welsh Valleys
Well, we have had the reopening of the Ebbw Vale Branch,though only if you're going to Cardiff as the connection to Newport still appears to be in limbo due to signaling problems,and we have just had a new bridge down West (at Lougher I think) which means we now have more capacity through to Carmarthen. Oh and there is talk of a NEW Railway Station at Pwll y Pant (there was a massive Viaduct here many years ago) in Caerphilly.
And we must not forget Electrification of the London / Swansea main line,just have to wait and see what happens though.
And we must not forget Electrification of the London / Swansea main line,just have to wait and see what happens though.
Similar topics
» UKTS and real lives
» New Developments
» golden age developments
» La Parenzana - the Real Thing
» The real wsr Dinning train
» New Developments
» golden age developments
» La Parenzana - the Real Thing
» The real wsr Dinning train
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum